Warning: mkdir(): No space left on device in /home/www/wwwroot/Z1024.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/cancen.net/cache/c8/2095c/6e65d.html): failed to open stream: No such file or directory in /home/www/wwwroot/Z1024.COM/func.php on line 115
Wuhan dianjin technology co., ltd. 130t/d calendering second-line ignition-Nanjing Bai Shing Glass Technology Co., Ltd.






  • 麻豆传媒在线观看,麻豆91精品91久久久停运原因,麻豆影视在线播放,亚洲91麻豆又大又粗又黄

    麻豆91精品91久久久停运原因

    Case

    Product Categories

    Contact Us

    1493183946284529.jpg

    Wuhan dianjin technology co., ltd. 130t/d calendering second-line ignition

    Your current locations: Home >> Case >> Engineering Case

    Wuhan dianjin technology co., ltd. 130t/d calendering second-line ignition


    Wuhan dianjin technology co., ltd. 130t/d calendering second-line ignition

    Wuhan dianjin technology co., ltd. 130t/d calendering second-line ignition


    Wuhan Dianjin Technology Co., Ltd. is a professional manufacturer of high-grade calendered glass. In addition to producing ordinary calendered glass, the company also produces high-white calendered glass. The company's products have a high reputation in South China and Central China.


         


        Line 2 of the company was discontinued in July 2016. Our company undertakes the general contract of cold repair and reconstruction project of kiln. Include glass liquid removal, kiln dismantling, supply of refractory and supplementary steel, kiln construction, firing and baking kiln and thermal insulation of hot kiln. Due to the change of market conditions, the owner requires ignition conditions within 30 days. Because the kiln was not dismantled when the maintenance plan was formulated, some damaged parts could not be estimated. In the process of cold repair, overcome the difficulty of temporarily adding materials, complete the cold repair and transformation of the project on time, and ignite on October 12.








    Tags:Glassfurnacedesign

    Share
    網站地圖